CEC FPIP 2026 Applications Due December 17, 2026
Days left
Request a Project Fit Review
California Food Processing Facilities

Planning a Major Energy Upgrade? California's FPIP 2026 Could Fund Part of the Project.

The California Energy Commission has opened a competitive $5 million solicitation for advanced energy and decarbonization projects at existing California food-processing facilities. Thermal Energy HQ helps project teams evaluate the thermal-system side of a potential project — heat pumps, heat recovery, thermal storage and load shifting — before the application is built.

Thermal Energy HQ is not affiliated with the California Energy Commission. Program funding, project eligibility, award decisions, requirements, and deadlines are determined by the CEC and may change. Confirm all information with the official GFO-26-302 solicitation before making project or financial decisions.

People on a produce processing floor.
GFO-26-302 · Active

Funding at a Glance

Figures as published by the California Energy Commission for the Food Production Investment Program 2026.

$5M
Available

Total solicitation funding

$2.5M
Minimum Award

Smallest individual award

$5M
Maximum Award

Largest individual award

25%
Minimum Match

Of FPIP funds requested

Applications Due December 17, 2026 · 11:59 PM, via the CEC's ECAMS portal

This is a competitive grant solicitation, and funding is not guaranteed. Applications are screened and scored by the CEC, and a single award can consume most or all of the available $5 million. For reference, a $2.5M request requires at least $625,000 in match funding, and a $5M request requires at least $1.25M — match commitments must be documented in signed letters submitted with the application.

Is Your Facility in the Eligible Group?

FPIP 2026 is open to existing food-processing facilities located in California. The CEC identifies these industry categories by NAICS code:

NAICS 311

Food Manufacturing

Processing and production facilities that turn raw agricultural products into food.

NAICS 3121

Beverage Manufacturing

Beverage production facilities operating in California.

NAICS 493120

Refrigerated Warehousing & Storage

Cold storage facilities that support food processing.

NAICS 115114

Postharvest Crop Activities

Postharvest crop activities, except cotton ginning.

Other food-processing support facilities may also be considered.

Farms and agricultural businesses are not automatically eligible — the program is defined around food processing. Final eligibility is determined by the CEC under the solicitation manual.

Not Sure Where Your Facility Fits?
Request a Project Fit Review
Eligible technologies

What Types of Projects Is CEC Targeting?

The CEC's September 2026 pre-application materials identify three eligible technology categories. Projects must also address at least two program goals: electrifying food-related processes, reducing GHG emissions, reducing energy use, supporting grid reliability, or benefiting priority populations.

MICROGRIDS

Systems that combine solar PV, battery or thermal storage, and controls to operate as a single unit — either connected to the grid or independently in island mode — while supporting critical loads at the site.

ELECTRIFICATION

Replacing existing fossil-fueled food-processing equipment with electric-powered equipment — the CEC's own example is converting gas dryers to electric dryers.

INDUSTRIAL HEAT PUMPS

Installing industrial heat pumps that recover otherwise wasted thermal energy and recycle it for reuse within the facility.

Source: CEC GFO-26-302 Pre-Application Workshop presentation (Solicitation Manual, Section II.B.2).

The timing problem

Where Thermal Storage Can Fit

Food-processing loads don't always occur when it's best to generate thermal energy. Washdown, sanitation, cooking, pasteurization and CIP cycles tend to arrive in peaks, while heat pumps run most efficiently at steady output and recovered heat is only available while the source process is running.

Thermal storage lets an engineered system create or recover thermal energy at one time and use it later — decoupling when heat is produced from when the process needs it. That can allow equipment to be sized to average load instead of peak load, and can shift electric heating away from the facility's utility peak periods.

The CEC's eligible microgrid category specifically references battery or thermal storage as potential system components. Separately, the CEC awards preference points for reducing a facility's electricity use during its utility rate peak periods.

POTENTIAL PROJECT ARCHITECTURE

• Industrial heat pumps generating process heat from electricity

• Recovered thermal energy from refrigeration, compressors or process exhaust

• Thermal storage — modular tanks sized to the load and the available space

• Controls that decide when to charge and when to draw

• Other eligible equipment defined by the project, such as solar PV or batteries in a microgrid

1
Generate / Recover Heat

Heat pumps, recovered process heat, or other thermal sources run when conditions are best.

2
Store Thermal Energy

Insulated, water-based thermal storage holds the energy until it's needed.

3
Serve Process Load When Needed

Stored energy meets hot-water and process-heating demand during peaks.

Eligibility depends on the whole system. Thermal storage may be incorporated into an eligible FPIP project configuration, depending on the project design and CEC requirements. The total system configuration determines potential FPIP eligibility, and final project and equipment eligibility is determined by the California Energy Commission.

Is Your Project Ready?

The CEC is looking for applicants with clear intentions and a build-ready path forward. Use this checklist to gauge how defined your project is today.

This is a readiness checklist, not an eligibility test. Only the CEC can determine whether a facility or project is eligible.

CHECK EACH THAT APPLIES
0 of 7 checked
Check the items that describe your project.

Your answers stay in your browser and are not submitted.

Why Start With the System Design?

FPIP applications are scored on technical merit, technical approach, and quantified impacts and benefits. Applicants submit a project narrative, scope of work, schedule, budget and the CEC's FPIP Benefits Calculator — and the estimated energy and emissions savings must match across all of them.

That means the project has to be more specific than "install a heat pump" or "add thermal storage." It needs a defined technical approach that connects today's process to a measurable result.

1
Existing process

Which process, line or load is being upgraded — and how it operates today.

2
Existing energy use

Measured electricity and fuel consumption, load profile and peak timing.

3
Proposed equipment

The specific system configuration that replaces or supplements what's there.

4
Expected change in performance

The engineering basis for changes in energy use, GHG emissions and grid impact.

5
Measurement and verification

How results will be measured — FPIP requires pre-installation and post-installation M&V.

Engineering support

How Thermal Energy HQ Can Help

We work with your facility, engineers and project team on the thermal side of the project — so the system you propose is one you can actually build.

Thermal Load Review

Map hot-water and process-heating loads, operating schedules and peak timing so the project starts from real demand.

System Configuration

Lay out how heat sources, storage, controls and existing equipment work together — within your mechanical and space constraints.

Thermal Storage Sizing

Size storage to the load and recovery requirements using modular 350, 500 and 700 gallon Thermal Tanks that can be combined for larger systems.

Heat Pump / Heat Recovery Integration

Pair storage with heat pumps, recovered heat and other hydronic equipment, with piping and controls matched to the project.

Important FPIP Requirements

Competitive application

Applications are screened pass/fail, then scored. A minimum of 70 of 100 points is required to be considered for funding.

25% minimum match

Match funding of at least 25% of the FPIP funds requested, committed in signed letters submitted with the application.

CEC application requirements

Nine required attachments, including a project narrative, scope of work, schedule, budget, CEQA form and FPIP Benefits Calculator, submitted through ECAMS.

Measurement and verification

Awarded projects perform pre-installation and post-installation M&V on the equipment or systems installed.

California facility requirement

The applicant must be an existing food-processing facility located in California, registered and in good standing with the California Secretary of State.

December 17 deadline

Applications are due December 17, 2026 at 11:59 PM. ECAMS rejects late submissions, including ones still uploading at the deadline.

Eligible and ineligible costs must be reviewed against the official solicitation manual. The CEC's workshop materials list items such as installation labor, equipment warranties and grant writing as ineligible for FPIP reimbursement.

Read the GFO-26-302 solicitation files →

Frequently Asked Questions

Questions about your specific facility or system?

Request a Project Fit Review

What is the California Food Production Investment Program?

The Food Production Investment Program (FPIP) is a California Energy Commission grant program that funds the implementation and demonstration of advanced energy and decarbonization technologies at California food-processing and supporting facilities. FPIP 2026 is solicited under GFO-26-302 and targets commercially available, proven technologies that reduce greenhouse gas emissions, lower energy use and support electrical grid reliability.

How much funding is available under FPIP 2026?

The CEC lists $5,000,000 in available funding for GFO-26-302, with a minimum award of $2,500,000 and a maximum award of $5,000,000. Applicants must provide match funding of at least 25% of the FPIP funds requested. Awards are competitive and not guaranteed.

Does thermal energy storage qualify for FPIP?

Thermal storage is identified by the CEC as a possible component of an eligible microgrid: the CEC describes eligible microgrids as systems that include solar PV, battery or thermal storage, and control technologies operating as a single unit. Thermal storage does not qualify automatically on its own. Eligibility depends on the overall project configuration and the CEC’s requirements, and final project and equipment eligibility is determined by the California Energy Commission.

What kinds of food-processing facilities can apply?

Eligible applicants are existing food-processing facilities located in California. The CEC identifies NAICS 311 (Food Manufacturing), 3121 (Beverage Manufacturing), 493120 (Refrigerated Warehousing and Storage) and 115114 (Postharvest Crop Activities, except Cotton Ginning). Additional food-processing support facilities may be considered. Agricultural businesses are not automatically eligible.

Does Thermal Energy HQ prepare the grant application?

No. Thermal Energy HQ’s role is project and system evaluation and engineering support: thermal load review, system configuration, thermal storage sizing and heat pump or heat recovery integration. We can provide the technical information your application team needs about the thermal system. We do not prepare or submit FPIP applications, and we do not determine CEC eligibility — the California Energy Commission does.

When is the FPIP 2026 application deadline?

Applications for GFO-26-302 are due December 17, 2026 at 11:59 PM and must be submitted through the CEC’s ECAMS portal. The CEC notes that ECAMS submission support is available until December 16, 2026 at 5:00 PM, and late submissions are rejected. Confirm current dates on the official solicitation page.

Get in touch

Let's review your project

Send us a message and our team of experts will get right back to you — or grab a time on our calendar below.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Address
900 South Glaspie Street, Oxford, MI 48371 USA

Prefer to book a time? Grab a slot below

Request a Project Fit Review