Elective Pay for Thermal Energy Storage: How Schools, Cities, Hospitals and Nonprofits Get the 48E Credit as Cash

This is the main image for the blog hero section. It shows a current image related to the blog.

A tax credit is worth nothing to an owner with no tax to offset. Section 6417 of the Internal Revenue Code, added by the Inflation Reduction Act and left in place by the July 2025 legislation, lets public and nonprofit applicable entities elect to treat the Section 48E clean electricity investment credit as a payment of tax, which the IRS then refunds.

The practical result is a cash payment equal to the credit, paid after the return for the year the storage is placed in service. For thermal storage under 1 MW, the credit rate can be 30 percent of eligible basis, subject to the Section 48E HVAC eligibility test, filing requirements, domestic content rules, prohibited foreign entity rules, and the statutory phase-out.

Key Takeaways

  • Applicable entities under Section 6417(d)(1)(A) include tax-exempt organizations, states and their political subdivisions, the Tennessee Valley Authority, Indian tribal governments, Alaska Native Corporations, and cooperatives that furnish electricity to rural areas.
  • Applicable credits include the Section 48E clean electricity investment credit, listed at Section 6417(b)(12). Section 48E covers energy storage technology by reference to Section 48(c)(6), including thermal energy storage property.
  • The rate is 6 percent of eligible basis, or 30 percent for storage with a capacity under 1 MW or for projects meeting prevailing wage and apprenticeship requirements. Energy community and domestic content bonuses can add 2 or 10 percentage points.
  • The elective pay domestic content phase-down under 48E(d)(5), applying rules similar to 45Y(g)(12), is 100 percent for construction beginning before 2024, 90 percent in 2024, 85 percent in 2025, and 0 percent after December 31, 2025 unless the domestic content requirement is met. The applicable percentage stays at 100 percent for a facility under 1 MW.
  • The Secretary's domestic content exceptions apply where using U.S.-produced steel, iron and manufactured products would increase overall construction cost by more than 25 percent or where the products are not available in sufficient and reasonably available quantities or of satisfactory quality, as described on the IRS elective pay page.
  • Under TD 9988, effective May 10, 2024, the entity completes pre-filing registration, obtains a registration number, and makes the election on an original return filed by the due date including extensions. The election is irrevocable and cannot be made for the first time on an amended return.
  • Under Section 6417(d)(6), an excessive payment raises the entity's tax by the excess plus 20 percent of the excess unless reasonable cause is shown.
  • Storage beginning construction after December 31, 2025 is subject to the prohibited foreign entity rules. Notice 2026-15, issued February 12, 2026, provides interim safe harbors.
  • With the applicable year fixed at 2032, Section 48E phases down for construction beginning in 2033, 2034 and 2035. The storage credit is 100 percent in 2033, 75 percent in 2034, 50 percent in 2035 and zero after.

Section 6417(d)(1)(A) names the applicable entities, Section 6417(b)(12) lists the 48E credit among the credits they may elect, and the election is made on an original return filed by the due date including extensions, after pre-filing registration with the IRS. The credit is 6 percent of eligible basis, or 30 percent for energy storage with a capacity under 1 megawatt or for projects that meet prevailing wage and apprenticeship rules, plus up to 10 percentage points each for domestic content and energy community.

Elective pay carries two conditions the credit itself does not: a domestic content phase-down that reduces the payment to zero for construction beginning after December 31, 2025 unless the domestic content requirement is met, with an exception for storage under 1 megawatt, and an excessive payment penalty of 20 percent. Storage whose construction begins after December 31, 2025 is also subject to the prohibited foreign entity rules, and the storage credit phases down for construction beginning after 2033.

Whether the storage qualifies at all turns on the HVAC test in the 48E eligibility article: storage that heats or cools the building qualifies; storage that only supplies domestic hot water for consumptive use does not.

In this article

Who can elect

Section 6417(d)(1)(A) defines an applicable entity as a tax-exempt organization, any state or political subdivision, the Tennessee Valley Authority, an Indian tribal government, an Alaska Native Corporation, or a corporation operating on a cooperative basis that furnishes electric energy to persons in rural areas.

A political subdivision reaches further than the word suggests: a school district, county, city, public hospital district, housing authority, public university, and water or park district are all political subdivisions of their state. A private university or hospital that is a 501(c)(3) is an applicable entity through the tax-exempt organization category.

Partnerships and S corporations are not applicable entities, and TD 9988 limits their own elections to the 45V, 45Q and 45X credits. An applicable entity that co-owns a plant through a partnership therefore cannot elect for its share unless the co-ownership validly elects out of subchapter K under Section 761(a); the final regulations say so and refer to a companion proposed rule on joint ownership.

A public owner that intends to share a central plant with a private developer should settle the ownership form with counsel before the first purchase order, because the form decides whether the credit is cash, a transferable credit, or nothing.

The regulations also remove the obstacle that kept these owners out before 2023: for an applicable entity, the credit is determined without regard to Section 50(b)(3) and (4)(A)(i), the rules that otherwise deny investment credits for property used by tax-exempt organizations and governmental units.

What the credit reaches, and the one test that matters

Section 48E(c)(2) gives energy storage technology the meaning in Section 48(c)(6), which includes thermal energy storage property: a system directly connected to a heating, ventilation or air conditioning system, that removes heat from or adds heat to a storage medium for subsequent use, and that provides energy for heating or cooling the interior of a residential or commercial building.

The 48E eligibility article works through that test, Treasury's regulations at 26 CFR 1.48E-2, the one-hour safe harbor, the incremental cost rule for heat pumps that also serve HVAC, and the exclusion Treasury stated in its preamble: stored energy for domestic hot water supply for consumptive use is not within the definition.

A hot water tank charged by a heat pump and feeding hydronic radiators, air handler coils or radiant floors is in; a tank feeding showers and sinks is out. A shared bank needs an allocation the regulations do not prescribe, so the two services belong in separate modules.

For a public or nonprofit owner, practical candidates are hydronic heating plants in schools, libraries, recreation centers, administration buildings, dormitories and clinics; chilled water storage for central plants; and buffer and storage tanks that let an air-to-water heat pump replace a boiler without a service upgrade. The boiler electrification article covers the capacity arithmetic.

The rate, and why 1 MW is the number public owners should know

Section 48E(a)(2) sets the applicable percentage at 6 percent, rising to 30 percent for a facility with a maximum net output under 1 megawatt measured in alternating current, for storage under 1 megawatt capacity, or for projects that meet the prevailing wage and apprenticeship requirements of 48E(d)(3) and (d)(4).

The energy community bonus under Section 48E(a)(3)(A) adds 2 percentage points at the 6 percent rate and 10 percentage points at the 30 percent rate. The domestic content bonus under Section 48E(a)(3)(B) adds the same, provided the project meets an adjusted domestic content percentage of 50 percent for construction beginning in 2026 and 55 percent after December 31, 2026.

The 1 MW line matters twice for elective pay. First, it is the route to 30 percent without the prevailing wage and apprenticeship file. Second, 45Y(g)(12)(B), applied to 48E by 48E(d)(5), keeps the elective pay applicable percentage at 100 percent for a facility under 1 MW regardless of domestic content.

A public owner whose storage is under 1 MW keeps the whole payment. One whose storage is over 1 MW and whose construction begins after December 31, 2025 keeps none of it unless the domestic content requirement is met or one of the Secretary's exceptions applies.

How 1 MW is measured for thermal storage is a question for the tax advisor on the facts; the 48E article addresses the capacity conventions and the Form 3468 instructions.

The domestic content phase-down that applies only to elective pay

A taxable owner that misses domestic content loses only the 10-point bonus. An applicable entity that misses it can lose the payment. Section 45Y(g)(12)(C), which 48E(d)(5) applies to the investment credit, sets the applicable percentage of the credit an applicable entity may elect as a payment:

  • Construction began before January 1, 2024: 100 percent of the credit.
  • Construction began in calendar year 2024: 90 percent of the credit.
  • Construction began in calendar year 2025: 85 percent of the credit.
  • Construction began after December 31, 2025: 0 percent of the credit.

Routes to a full payment

The 100 percent figure is restored where the facility meets the domestic content requirement in 45Y(g)(11)(B), where the facility is under 1 MW, or where the Secretary provides an exception under 45Y(g)(12)(D).

The IRS elective pay page describes the two exceptions: using U.S.-produced steel, iron and manufactured products would increase overall construction cost by more than 25 percent, or those products are not available in sufficient and reasonably available quantities or of satisfactory quality.

Notice 2024-84 accepts an attestation and recordkeeping, as the IRS page describes, to establish the exception for projects that begin construction before the later of January 1, 2027 or further guidance.

An owner over 1 MW beginning construction in 2026 has three routes to a full payment: meet the 50 percent adjusted domestic content percentage with supplier certifications, document the cost or availability exception, or restructure the project under 1 MW.

Prohibited foreign entities and the 2033 phase-out

Two further conditions attach to the credit itself and therefore to the payment. Under 48E(c)(3), energy storage technology whose construction begins after December 31, 2025 is excluded if it includes material assistance from a prohibited foreign entity. Under 48E(d)(6), no credit is allowed to a specified foreign entity or a foreign-influenced entity.

Notice 2026-15, announced February 12, 2026, explains how to determine whether storage receives material assistance, supplies interim safe harbors with example calculations, and may be relied on for storage beginning construction after December 31, 2025 until 60 days after the forthcoming safe harbor tables are published.

For a public owner, the operational consequence is a procurement file: supplier documentation of the material assistance cost ratio, collected before award rather than after.

The phase-out is the other clock. Pub. L. 119-21 fixed the applicable year in 45Y(d)(3) at calendar year 2032, so under 48E(e)(2) the storage credit is 100 percent for construction beginning in 2033, 75 percent in 2034, 50 percent in 2035 and zero for construction beginning later.

Storage is excepted from the December 31, 2027 placed-in-service termination that applies to wind and solar facilities under 48E(e)(4). A public capital plan that runs on bond cycles should put storage projects inside the 2033 window.

A worked example, with the assumptions labeled

A county recreation center replaces a gas boiler with an air-to-water heat pump plant charging four 700-gallon TEHQ Thermal Tank modules that feed the building's hydronic heating coils. Each module stores 108 kWh thermal at a 35 C (63 F) delta per the specification sheet, or 432 kWh thermal for the bank at the rated delta.

The stored heat serves the HVAC system and heats the building interior, which is the class of property the regulations describe; the determination is the county's tax advisor's to make.

  • Eligible incremental basis, after the incremental cost rule for the heat pump that also serves real-time heating: $350,000 (assumed).
  • Storage capacity: under 1 MW (assumed), so the 30 percent rate applies without the prevailing wage and apprenticeship file.
  • Base credit: $350,000 × 0.30 = $105,000.
  • Elective pay applicable percentage: 100 percent, because the facility is under 1 MW; no domestic content certification is needed to keep the payment.
  • Energy community bonus, if the site qualifies: 10 percentage points, $35,000, for a payment of $140,000 (labeled as conditional).
  • Domestic content bonus: a further 10 percentage points only if the project meets the 50 percent adjusted percentage for construction beginning in 2026.
  • Prohibited foreign entity: construction begins in 2026, so the county collects material assistance documentation from the tank, heat pump and controls suppliers under Notice 2026-15 before award.
  • Basis: Section 6417(g) applies rules similar to Section 50 for basis reduction and recapture, so the county's accounting basis in the plant is reduced accordingly and the credit is subject to recapture if the property is disposed of early; the advisor sets the figures.

Sizing limitation

The sizing calculator sets the module count from the building's heating load and the usable delta rather than the rated delta. The figures above illustrate the credit arithmetic, not the design.

The filing sequence, from placed in service to payment

TD 9988 and the IRS elective pay page set the order:

  • Confirm the entity is an applicable entity and that the property is held directly, not through a partnership, or that a Section 761(a) election out of subchapter K is in place.
  • Place the storage in service and fix the tax year; the credit is determined for that year.
  • Complete pre-filing registration through the IRS portal and obtain a registration number for the property. Section 6417(d)(5) authorizes the requirement and the regulations make the number a condition of the election.
  • File an original return for the year with the election and the registration number. For tax-exempt entities, the return is generally Form 990-T, with Form 3468 for the credit. Rev. Proc. 2024-39 gives certain applicable entities an automatic six-month extension where Form 8868 was not timely filed, and the regulations allow the 301.9100-2(b) automatic six-month extension where the return was timely filed without an extension.
  • Do not rely on an amended return: the regulations do not allow a first-time election on one, though numerical errors on a properly made election can be corrected.
  • Receive the payment, treated under Section 6417(d)(4) as made on the later of the return due date without extensions or the filing date, and refunded as an overpayment.
  • Keep the file: an excessive payment raises the entity's tax by the excess plus 20 percent unless reasonable cause is shown.

Stacking elective pay with the other money

Utility custom incentives, state programs and C-PACE each interact with the credit differently, and each has its own article.

The point that belongs here is sequence: the credit is computed on eligible basis, Section 6417(g) applies rules similar to Section 50 on the basis side, and the advisor decides whether any specific grant or incentive changes the basis before the credit is computed.

A public owner that cannot use C-PACE, which runs through the property tax bill, usually pairs elective pay with bonds, state revolving funds or a utility program instead.

Frequently Asked Questions

Can a school district or city get the energy storage tax credit?

Yes, through elective pay under Section 6417. States and their political subdivisions, including school districts, cities, counties, public universities and housing authorities, are applicable entities under 6417(d)(1)(A), and the 48E credit is an applicable credit under 6417(b)(12). The entity elects on an original return after pre-filing registration and receives the credit as a refund, subject to the entity's tax advisor's determination on the facts.

Does a hot water storage tank qualify?

Only when the stored heat serves the building's HVAC system and heats or cools the building interior. Treasury's preamble states that stored energy for domestic hot water supply for consumptive use is not within the definition. The 48E eligibility article covers the test.

What is the elective pay domestic content rule?

For construction beginning after December 31, 2025, the payment is 0 percent of the credit unless the domestic content requirement is met, under 45Y(g)(12) as applied by 48E(d)(5). Facilities under 1 MW keep 100 percent regardless, and the Secretary's cost-increase and availability exceptions restore 100 percent where documented.

How much is the credit?

The credit is 6 percent of eligible basis, or 30 percent for storage under 1 MW or projects meeting prevailing wage and apprenticeship requirements, plus up to 10 percentage points for an energy community and up to 10 percentage points for domestic content.

When must the election be made?

The election must be made on an original return filed by the due date including extensions, with the registration number from pre-filing registration. The election is irrevocable and cannot be made on an amended return. Automatic six-month extensions exist under the regulations and Rev. Proc. 2024-39 for certain late filers.

What happens if the payment is too large?

Section 6417(d)(6) increases the entity's tax by the excessive amount plus 20 percent of it unless the entity shows reasonable cause.

When does the storage credit end?

It phases down for construction beginning after 2033: 75 percent in 2034, 50 percent in 2035 and zero after. Storage is not subject to the December 31, 2027 placed-in-service cutoff for wind and solar.

Do the foreign entity rules apply to a city?

The material assistance rule in 48E(c)(3) applies to any storage beginning construction after December 31, 2025, whoever owns it. Notice 2026-15 provides the interim method for the cost ratio; the owner collects supplier documentation before award.

The bottom line

Elective pay converts a credit that public and nonprofit owners could never use into a cash refund of 30 percent of eligible basis for storage under 1 MW. The under-1 MW line also keeps the full payment without a domestic content file.

The conditions are procedural rather than technical: register before filing, elect on an original return, document the prohibited foreign entity position for anything starting construction after 2025, and begin construction before the 2033 phase-out.

The technical condition sits upstream, in the 48E test: the stored heat has to serve the building's heating or cooling. Put the space heating storage and the domestic hot water storage in separate modules, price the plant with storage so it fits the service, and have the entity's tax advisor confirm the election before the purchase order is signed.

Explore the right thermal

energy solution for your project.

Tell our team about your building, operating goals, and energy needs.

Get in touch

Let's review your project

Send us a message and our team of experts will get right back to you — or grab a time on our calendar below.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Address