Oregon's standard is based on ASHRAE Standard 100 rather than a carbon limit, and hotels are among the first buildings required to comply. House Bill 3409 (2023) directed the Oregon Department of Energy to write an energy performance standard for existing commercial buildings; ODOE adopted the rules in December 2024, effective January 1, 2025.
Tier 1 hotels, motels and other nonresidential buildings of at least 35,000 square feet must meet a site energy use intensity target, follow an investment criteria pathway or use conditional compliance. Deadlines begin June 1, 2028 for buildings of 200,000 square feet and larger and extend to June 1, 2030 for buildings from 35,000 to 90,000 square feet.
For a hotel, the Compliance Cycle One target is 65 kBtu per square foot per year in climate zone 4C and 69 kBtu per square foot per year in zone 5B. EIA's 2018 CBECS assigns 16.5 of 85.7 kBtu per square foot of lodging site energy to water heating, or 19.3 percent. On labeled assumptions, electrifying that load with a heat pump plant and thermal storage closes about 70 percent of a 15 kBtu per square foot gap.
Key Takeaways
- Tier 1 covers hotel, motel and nonresidential buildings of 35,000 square feet or more of gross floor area excluding parking garages. Tier 2 covers hotel, motel and nonresidential buildings of 20,000 to 35,000 square feet and buildings of 35,000 square feet or more used as multifamily residential, hospitals, schools, dormitories, university buildings, barracks, prisons or residential and senior care facilities. Residential condominiums are not covered.
- Tier 1 deadlines are June 1, 2028 for 200,000 square feet and greater, June 1, 2029 for 90,000 to 200,000 square feet, and June 1, 2030 for 35,000 to 90,000 square feet. Tier 2 reports energy data by July 1, 2028, with no target or penalties at present.
- Tier 1 has three pathways: meet the EUI target; follow the investment criteria pathway after an energy audit and life cycle cost assessment; or file conditional compliance while measures are implemented.
- Tier 1 buildings need an operations and maintenance program in place 12 months before the compliance date, an energy management plan and a qualified energy manager.
- Compliance Cycle One lodging targets in climate zones 4C and 5B are: hotel, 65 and 69; motel or inn, 83 and 87; other lodging, 78 and 81 kBtu per square foot per year.
- EUI uses 12 continuous months of all-fuel data within the 24 months before Form C. Documents may be submitted from July 1, 2026, and the compliance portal was expected in summer 2026.
- Tier 1 failure to report can bring up to $5,000 plus up to $1 per square foot per year. Under an ODOE mitigation plan, the amounts can be reduced to 30 percent of $5,000 and $0.20 per square foot. Tier 2 has no penalties at present.
- The Early Compliance Action and Planning Program offers up to $0.85 per square foot subject to caps. The Building Energy Reduction Incentive offers up to $100,000 per Tier 1 building and $50,000 per Tier 2 building for eligible buildings above target with an audit.
- EIA's 2018 CBECS puts lodging water heating at 16.5 of 85.7 kBtu per square foot, or 19.3 percent of lodging site energy.
Oregon's standard reaches hotels first. ODOE mailed more than 30,000 notices to owners in June 2025 and set the first compliance date for June 1, 2028. A 200,000-square-foot Portland hotel therefore has about 19 months from this article's date to its first compliance filing.
Hotels and motels are Tier 1 alongside offices, retail and other nonresidential uses. Multifamily buildings, hospitals, schools and dormitories of 35,000 square feet or more are Tier 2; they report energy data from July 1, 2028 and have no target yet.
A hotel plan is framed by two values: the applicable site EUI target and the hotel's hot water share. The building's own metered and weather-normalized data must replace the CBECS share used in any planning estimate.
In this article
- Who is in which tier, and when
- The three Tier 1 pathways and the forms
- The targets, and how ODOE set them
- Penalties and incentives
- Where hot water sits in a hotel's EUI
- Why storage decides whether the plant fits the hotel
- An Oregon compliance sequence for a hotel
- Frequently Asked Questions
- The bottom line
Who is in which tier, and when
ODOE's BPS FAQ and program page define Tier 1 as hotel, motel and nonresidential buildings with at least 35,000 square feet of gross floor area excluding parking garage area.
Tier 2 has two parts: hotel, motel and nonresidential buildings of 20,000 to 35,000 square feet, and buildings of 35,000 square feet or more used as multifamily residential, hospitals, schools, dormitories, university buildings, barracks, prisons and residential or senior care facilities. For a multi-tenant building, the owner is responsible. For a commercial HOA without an owner, the board is responsible.
The October 2025 standard revision extended exemption eligibility to Tier 2. ODOE has been working with the Hospital Association of Oregon, Multifamily Northwest, school districts, universities and the Oregon Restaurant and Lodging Association on the Tier 2 approach.
- Tier 1, 200,000 square feet and greater: June 1, 2028.
- Tier 1, 90,000 to 200,000 square feet: June 1, 2029.
- Tier 1, 35,000 to 90,000 square feet: June 1, 2030.
- Tier 2 energy data reporting: July 1, 2028.
- ODOE evaluation of Tier 2 data: July 1, 2029.
- ODOE recommendations for a Tier 2 standard: October 1, 2030.
- Tier 2 currently has no performance target or penalty.
The three Tier 1 pathways and the forms
The Tier 1 compliance summary sets out three routes. Every Tier 1 building also needs an operations and maintenance program implemented 12 months before its compliance date and a qualified energy manager.
- EUI target: Establish the weather-normalized site EUI in ENERGY STAR Portfolio Manager using 12 continuous months of electricity, natural gas and other fuels within the 24 months before Form C. Create the target under the Oregon ASHRAE 100 standard, identified as ASHRAE Standard 100-2024 with Oregon amendments in OAR 330-300. File Form A, or Form G for grouped buildings, Form B for building activity and target, and Form C for the EUI calculation with the O&M program and energy and emissions management plan. Form D is a decarbonization plan for campuses with district heating or cooling.
- Investment criteria: For a building that cannot meet or cannot develop a target, file an energy audit on Form E and a life cycle cost assessment on Form L, then implement all cost-effective efficiency measures.
- Conditional compliance: For a building that has had an audit, implemented measures and expects to meet its target after the compliance date, file Form C annually until the target is reached.
- Exemptions and historic documentation: File Form X for exemptions and renew the exemption each five-year cycle. File Form H for historic documentation.
Data, timing and exemptions
EUI is measured from 12 continuous months of all fuels within the 24 months before Form C. Documents may be submitted from July 1, 2026, and the compliance portal, built on Clearly Energy's BEAM software, was expected to open in summer 2026.
Exemption grounds include occupancy below 50 percent over the prior 12 months, conditioned floor area under 35,000 square feet, factory or high-hazard use over more than half the floor area, agricultural use and financial hardship. Form X must be filed even when the owner believes the building is exempt. Exempt buildings remain covered.
ODOE's December 2025 roster listed 45 energy professionals: 25 qualified energy managers, 27 qualified persons and 33 qualified energy auditors. Many held more than one role. For a 2028 building, qualified-person availability is a scheduling constraint.
The targets, and how ODOE set them
ODOE's December 31, 2024 EUI target report sets Compliance Cycle One targets from average EUIs converted to Northwest climate zones 4C and 5B with ASHRAE 100 climate adjustment factors. ODOE trended the values at a national 1.7 percent per year decline from about 2019 to the 2027 baseline year.
HB 3409 requires the target to be no more stringent than the average EUI. The targets are therefore average levels, not stretch goals. For hotels, ODOE used the regional CBSA average of 78 kBtu per square foot and CBECS average of 87 kBtu per square foot. For motels, it used the CBSA average of 98 and CBECS average of 71, with operating-hour normalization factors of 1.0 for lodging.
Targets for Compliance Cycle One are listed below in kBtu per square foot per year, with climate zone 4C first and 5B second.
- Hotel: 65 in zone 4C; 69 in zone 5B.
- Motel or inn: 83 in zone 4C; 87 in zone 5B.
- Other lodging: 78 in zone 4C; 81 in zone 5B.
- Administrative or professional office: 50 in zone 4C; 52 in zone 5B.
- Retail store: 46 in zone 4C; 50 in zone 5B.
- Restaurant or cafeteria: 325 in zone 4C; 340 in zone 5B.
- Grocery or food market: 153 in zone 4C; 157 in zone 5B.
- Convenience store: 179 in zone 4C; 185 in zone 5B.
- Nonrefrigerated warehouse: 23 in zone 4C; 29 in zone 5B.
Mixed-use buildings
A hotel with a restaurant, pool and retail is a mixed-use building. Its target is area-weighted across activity types in the EUI calculator. The target for the hotel portion is the hotel value above.
An owner whose building is already below the target files and is done for the cycle. An owner whose building is above target chooses among the three pathways.
Penalties and incentives
The FAQ states that a Tier 1 owner who fails to report can face a civil penalty of up to $5,000 plus up to $1 per square foot per year. For a 120,000-square-foot hotel, that is up to $125,000 in the first year.
An owner who works with ODOE on a noncompliance mitigation plan can reduce the amount to 30 percent of $5,000 and $0.20 per square foot. The annual report states that penalties could apply no earlier than July 2028. Tier 2 has no penalties at present.
- The Early Compliance Action and Planning Program provides up to $0.85 per square foot for completing all compliance actions, with partial incentives for individual actions, from a $2 million state appropriation. Amounts are subject to caps.
- Round 1 used $1 million of the state funds and drew 81 applications requesting $1,522,000. Round 2 opened in 2026.
- The Building Energy Reduction Incentive uses $12 million in federal funds and offers up to $100,000 per Tier 1 building and $50,000 per Tier 2 building.
- The Building Energy Reduction Incentive applies to buildings with baseline EUI above target and an energy audit. Awards are competitive, with priority for cost-effective greenhouse gas reductions, rural buildings, multifamily and affordable multifamily.
- The January 2026 annual report supplies the program and application figures. Re-verify on publish day whether the portal opened, whether Round 2 closed and whether the 2027 legislature changed anything.
Where hot water sits in a hotel's EUI
The EIA 2018 Commercial Buildings Energy Consumption Survey reports lodging at 85.7 kBtu per square foot of site energy. Water heating accounts for 16.5 kBtu per square foot, or 19.3 percent. Space heating accounts for 15.7, cooking for 14.1, ventilation for 12.5 and lighting for 7.2 kBtu per square foot.
Water heating is the largest single end use in the lodging category. Guest showers concentrated in a two-hour morning window set both the peak and annual load; the hotel design article addresses that design condition.
Worked example: 120,000-square-foot hotel
The following example uses labeled assumptions throughout. It does not establish compliance for any building.
- Building: 120,000 square feet of hotel in climate zone 4C, with a June 1, 2029 compliance date; weather-normalized site EUI of 80 kBtu per square foot, assumed; gas-fired water heating.
- Target: 65 kBtu per square foot. Gap: 15 kBtu per square foot, or 18.8 percent.
- Water heating at the CBECS share: 80 × 0.193 = 15.4 kBtu per square foot of gas, or 1.85 billion Btu per year.
- Heat delivered at an assumed 80 percent boiler efficiency: 15.4 × 0.80 = 12.3 kBtu per square foot, or 1.48 billion Btu, equal to 433,000 kWh thermal per year and about 1,190 kWh thermal per day.
- Electrified at an assumed annual COP of 2.5: 433,000 kWh thermal ÷ 2.5 = 173,000 kWh electrical per year, equal to 590 million Btu and 4.9 kBtu per square foot of site energy.
- The COP assumption is within the 1.9 to 3.2 range measured at five California multifamily plants in the field study.
- Site EUI reduction: 15.4 − 4.9 = 10.5 kBtu per square foot, or 13.1 percent of the baseline and 70 percent of the 15 kBtu per square foot gap.
- New site EUI: 69.5 kBtu per square foot, or 4.5 kBtu per square foot above target. Envelope, controls, laundry heat recovery and kitchen measures carry the remainder, or the owner files conditional compliance while those measures are installed.
What the site-energy calculation means
Because the standard uses site energy, the heat pump's COP registers in the EUI calculation. The fuel switch itself does not lower EUI; the efficiency gain does.
At a COP of 1.9, the reduction falls to 8.9 kBtu per square foot. At a COP of 3.2, it rises to 11.6 kBtu per square foot.
Why storage decides whether the plant fits the hotel
The EUI arithmetic does not involve the tank. The project does. Storage addresses the morning peak, electrical service, demand charges, cold-climate operation and mechanical-room constraints.
- Peak: The example produces 1,190 kWh thermal per day. Assuming a peak of one-third of the day, the peak is about 400 kWh thermal. The TEHQ 700-gallon module stores 108 kWh thermal at a 35 °C (63 °F) delta, so four modules cover that peak at the rated delta before applying the usable delta. Each module is 60 inches in diameter and 88.6 inches tall, weighs 6,046 lb filled, imposes 308 lb per square foot and loses 2.4 °F per 24 hours. The sizing calculator sets the count from the hotel's own draw profile.
- Service: A heat pump plant sized to the boiler's recovery rate draws its full kW during the morning. A plant sized to the daily load with storage draws roughly half, which can determine whether the existing service holds. The NEC 220.87 article gives the measured-demand check.
- Demand charges: Oregon commercial tariffs bill demand. Charging storage overnight keeps the heat pump out of the billed window; the demand charge article provides the method.
- Climate: Zone 4C winters are mild and wet. Zone 5B east of the Cascades is cold and dry, and an air-source plant there needs the storage growth described in the cold-climate article.
- Temperature: Storage at 140 °F with a master mixing valve keeps Legionella control and the usable delta together, as described in the 140 °F article.
- Mechanical room: The modules assemble from panels inside the room. That matters where an existing hotel water-heater room was sized for a boiler; the existing-buildings article covers placement and floor loading.
An Oregon compliance sequence for a hotel
A hotel owner can organize the work around the compliance date, the building's measured EUI and the selected pathway.
- Confirm the tier and compliance date from gross floor area excluding parking. Register in Portfolio Manager and assemble 12 continuous months of all-fuel data.
- Run the EUI calculator for the building's activity types and compare the weather-normalized EUI with the target. A building above target should decide among the three pathways before the O&M program deadline.
- Retain a qualified energy manager and, if the investment criteria or conditional pathway is likely, a qualified energy auditor from ODOE's roster.
- Separate water-heating gas from the rest of the building's gas use with summer bills. Replace the 19.3 percent placeholder with the hotel's own share.
- Price a heat pump water heating plant sized to the daily load with storage. The hotel article and central plant sizing article address the design conditions. Run the electrical check before fixing the design.
- Apply to the Early Compliance Action and Planning Program and, if the building is above target with an audit, the Building Energy Reduction Incentive. Coordinate utility incentives and C-PACE through their own programs; incentive amounts from Energy Trust of Oregon are not specified here.
- Re-verify the targets, portal status and any 2027 legislation before quoting a number to an owner. Washington's standard is covered in a separate article.
Frequently Asked Questions
Which buildings are Tier 1 under Oregon's building performance standard?
Hotel, motel and nonresidential buildings of 35,000 square feet or more of gross floor area excluding parking garages. Compliance is due June 1, 2028 for 200,000 square feet and greater, June 1, 2029 for 90,000 to 200,000 square feet, and June 1, 2030 for 35,000 to 90,000 square feet.
Are apartment buildings covered?
Multifamily buildings of 35,000 square feet or more are Tier 2, together with hospitals, schools, dormitories, university buildings, barracks, prisons and senior care facilities. Tier 2 reports energy data by July 1, 2028 and has no performance target or penalty at present. ODOE is to recommend a Tier 2 standard by October 1, 2030.
What is the EUI target for a hotel in Oregon?
The Compliance Cycle One target is 65 kBtu per square foot per year in climate zone 4C and 69 kBtu per square foot per year in zone 5B. Motels are 83 and 87, and other lodging is 78 and 81. HB 3409 requires targets to be no more stringent than the average EUI.
What are the compliance pathways?
A Tier 1 building can meet the EUI target; follow the investment criteria pathway with an energy audit, a life cycle cost assessment and all cost-effective measures; or file conditional compliance annually after the compliance date until the target is reached. All Tier 1 buildings need an O&M program 12 months before the date, an energy management plan and a qualified energy manager.
What are the penalties?
For Tier 1, failure to report can bring up to $5,000 plus up to $1 per square foot per year. Under an ODOE mitigation plan, the amount can be reduced to 30 percent of $5,000 and $0.20 per square foot. Tier 2 has no penalties at present.
What incentives are available?
The Early Compliance Action and Planning Program pays up to $0.85 per square foot subject to caps. The Building Energy Reduction Incentive offers up to $100,000 per Tier 1 building and $50,000 per Tier 2 building for buildings above target with an audit, with priority for multifamily and affordable multifamily, rural buildings and cost-effective reductions.
How much of a hotel's energy is hot water?
EIA's 2018 CBECS puts lodging water heating at 16.5 of 85.7 kBtu per square foot, or 19.3 percent. It is the largest single end use in the lodging category.
How much does electrifying hot water reduce a hotel's EUI?
On labeled assumptions, a hotel at 80 kBtu per square foot with the CBECS water-heating share, an 80 percent boiler and a heat pump at COP 2.5 sees a reduction of about 10.5 kBtu per square foot, or 13 percent. That closes 70 percent of the gap to a 65 kBtu per square foot target. The hotel's own data must replace each planning input.
The bottom line
Oregon's standard uses a site EUI target set at the average, with a compliance clock beginning June 1, 2028 for the largest hotels and extending to 2030 for the smallest Tier 1 buildings. Apartments, hospitals and schools have a reporting-only obligation beginning July 1, 2028.
For a hotel, hot water is the largest lodging end use in the CBECS data. On the labeled CBECS share and a COP of 2.5, the heat pump plant delivers about 70 percent of a 15 kBtu per square foot gap by itself.
The heat pump produces the EUI reduction. Storage keeps the plant small enough for the electrical service, allows off-peak operation and supplies the morning peak. The owner should start the O&M program a year early, book the qualified energy manager, apply for early compliance funding and re-verify ODOE's targets and current program status before placing any figure in a capital plan.