Maryland's Building Energy Performance Standards, created by the Climate Solutions Now Act of 2022 and written into COMAR 26.28, begin with net direct emissions: the carbon that leaves a building's own flue. A gas boiler and a gas water heater create direct emissions; a heat pump operating on grid electricity does not under the current direct-emissions calculation.

For a commercial or multifamily building of 35,000 square feet or more, excluding parking garage area, that distinction places domestic hot water at the front of the compliance queue. A central hot water plant can be replaced without entering apartments, changing the envelope or modifying the heating distribution.

Benchmarking is due June 1 each year, the first third-party verification occurs in 2026, and property-specific net direct emissions limits apply from 2030, tighten in 2035 and reach zero in 2040. On labeled assumptions, a 100,000-square-foot gas-heated multifamily building produces about 2.6 kg CO2e per square foot, including about 1.1 kg CO2e per square foot from water heating. A heat pump water heater with thermal storage removes that water-heating direct-emissions line, although space heating must still follow.

Key Takeaways

  • Coverage: Commercial and multifamily buildings of 35,000 square feet or larger, excluding parking garage area, under COMAR 26.28. HB 49 (2025) excluded hospitals from the definition of covered building effective October 1, 2025. K-12 schools, federally owned buildings and several other categories can apply for exemption.
  • Benchmarking: Annual reporting in ENERGY STAR Portfolio Manager is due June 1 each year beginning with the 2025 report. Third-party verification by a professional engineer, licensed architect, certified energy manager or building energy assessment professional begins in 2026 and recurs every five years.
  • Net direct emissions standards: Standards are measured in kg CO2e per square foot: multifamily housing is 0.82 in 2030-2034, 0.41 in 2035-2039 and zero from 2040; hotels are 1.47, 0.74 and zero; senior living communities and residential care facilities are 1.43, 0.72 and zero; and residence halls or dormitories are 0.70, 0.35 and zero.
  • Annual test: Compliance is tested in every calendar year. The 2030-2034 standard applies in each of those five years, the 2035-2039 standard applies in each of those five years, and zero applies in 2040 and every year after.
  • Alternative compliance payment: The payment starts at $230 per metric ton CO2e in 2020 dollars, is inflation adjusted and rises by $4 in 2020 dollars each year from 2030. It applies only to emissions above the standard. Affordable housing owners may apply annually for a reduced rate.
  • HB 49 (2025): The law added a $100 annual reporting fee per covered building; allows Montgomery County's certified program to replace the state requirement; exempts SCIF buildings from EUI targets; excludes specified emergency backup generation and steam sterilization energy from 2030; credits on-site renewable generation against EUI targets; and requires MDE's cost-benefit analysis by December 31, 2026.
  • HB 1217: The 2026 bill would exempt certain buildings permitted before June 1, 2022 until major equipment reaches end of life. It was heard in the House Environment and Transportation Committee on March 11, 2026, and the bill page showed no committee vote or passage as of its June 30, 2026 update.

The first binding limits are on net direct emissions, not on total energy use. The site energy use intensity standard is still to come. Owners should re-verify the regulatory Table 1 values and the site EUI standard planned for 2027 against current MDE and COMAR materials on the publication date.

In this article

Who is covered and what is due each year

MDE's BEPS Program Background states that the standards apply to commercial and multifamily buildings "35,000 square feet or larger excluding any parking garage area." Benchmarking began in 2025, is annual and is due June 1 using ENERGY STAR Portfolio Manager.

The first third-party verification is in 2026 and repeats every five years. MDE accepts a U.S.-licensed professional engineer or architect, a certified energy manager or a building energy assessment professional as the verifier.

Exemptions come in two forms. One-time requests cover designated historic buildings, agricultural buildings, elementary and secondary schools, demolished buildings, manufacturing buildings and federally owned buildings. Annual requests cover unoccupied buildings and buildings under financial distress. A building less than 50 percent occupied may apply up to three times.

Affordable housing owners are not exempt but may apply annually for reduced alternative compliance payments. HB 49 added a hospital exclusion, so the 6.10 kg CO2e per square foot hospital line in the regulation's table no longer binds a general hospital. HB 49 also exempted buildings with a sensitive compartmented information facility from EUI targets.

The $100 annual reporting fee per covered building, adjusted for inflation, took effect with HB 49 on October 1, 2025. The enrolled HB 49 fiscal note estimated about $690,000 of revenue in fiscal 2026, which implies roughly 6,900 covered buildings statewide.

The net direct emissions standards that bind from 2030

COMAR 26.28.03.02 sets the standards in kg CO2e per square foot by Portfolio Manager property type. The property types where water heating is a large share of fuel use include the following:

  • Multifamily housing: 0.82 for 2030-2034, 0.41 for 2035-2039 and 0 from 2040.
  • Hotel: 1.47 for 2030-2034, 0.74 for 2035-2039 and 0 from 2040.
  • Senior living community: 1.43 for 2030-2034, 0.72 for 2035-2039 and 0 from 2040.
  • Residential care facility: 1.43 for 2030-2034, 0.72 for 2035-2039 and 0 from 2040.
  • Residence hall or dormitory: 0.70 for 2030-2034, 0.35 for 2035-2039 and 0 from 2040.
  • Barracks and prison or incarceration: 0.57 for 2030-2034, 0.29 for 2035-2039 and 0 from 2040.
  • Fitness center, health club or gym: 2.87 for 2030-2034, 1.43 for 2035-2039 and 0 from 2040.
  • Heated swimming pool: 2.07 for 2030-2034, 1.03 for 2035-2039 and 0 from 2040.
  • Laboratory: 5.35 for 2030-2034, 2.68 for 2035-2039 and 0 from 2040.
  • Supermarket or grocery: 2.25 for 2030-2034, 1.13 for 2035-2039 and 0 from 2040.
  • Office: 0.22 for 2030-2034, 0.11 for 2035-2039 and 0 from 2040.
  • Restaurant, food service, fast food, K-12 school and parking: exempt.

Annual compliance test

Section D of the same rule makes the test annual. A covered building shall not exceed the 2030-2034 standard in each of 2030, 2031, 2032, 2033 and 2034; the 2035-2039 standard in each of those five years; and the final standard of zero in 2040 and every year after.

Mixed-use buildings receive an area-weighted standard set by the compliance tool. Submetered parking and food service areas may be excluded from the weighting.

What counts as net direct emissions

Net direct emissions are the sum of all direct greenhouse gas emissions. For a building on district energy, the calculation includes the thermal inputs from the district system. TM 24-01 directs owners to the same emissions factors used by Portfolio Manager.

Portfolio Manager's August 2025 emissions reference lists natural gas at 53.11 kg CO2e per MBtu, fuel oil No. 2 at 74.2 kg CO2e per MBtu and propane at 61.95 kg CO2e per MBtu.

Electricity is treated as an emissions-free input for this direct-emissions calculation. Chilled water made from grid electricity is also treated as having no net direct emissions. A heat pump therefore counts as zero against this standard, while a condensing boiler still counts at 53.11 kg CO2e per MBtu of gas burned.

The alternative compliance payment

Owners whose buildings exceed the standard may pay instead of reducing emissions. MDE set the payment at EPA's social cost of greenhouse gas, which it describes as the lowest amount the statute permits: $230 per metric ton CO2e in 2020 dollars, adjusted for inflation, rising by $4 in 2020 dollars every year from 2030.

The payment applies only to emissions above the standard. MDE's example is a building emitting 20 metric tons against a 15-ton standard; the owner pays for 5 metric tons.

Under HB 49, buildings in a county with a certified program pay the county rather than the state. Counties may set their own fee and impose penalties of up to $25,000 per day. The fiscal note observes that payment revenue is expected to fall from fiscal 2031 as owners reduce emissions rather than pay, which is the intended outcome.

What HB 49 changed and what HB 1217 would change

HB 49, effective October 1, 2025, kept the 35,000-square-foot threshold and the 2030 and 2040 dates. The enrolled HB 49 fiscal note describes the statutory changes.

Hospitals are no longer covered buildings. A county program adopted by March 1, 2025 can be certified by MDE and replace the state requirement, which in practice means Montgomery County. SCIF buildings are exempt from EUI targets and from EUI reporting where a tenant withholds data.

Energy and emissions from emergency backup generation and steam sterilization are excluded for specified facilities from 2030. On-site renewable generation is credited against EUI targets, and on-site biomethane is credited against the direct emissions standard. The $100 annual fee funds administration.

MDE must deliver a cost-benefit analysis and recommendations, including benchmarks calculated from reported data, by December 31, 2026. MDE's program background says it plans to adopt the site EUI standard in 2027 using 2026 data.

HB 1217, introduced in the 2026 session with Senate cross-file SB 479, would bar MDE from requiring a building that received its use and occupancy permit before June 1, 2022 to meet BEPS or EUI targets until lighting, HVAC or other major components must be replaced because of failure or end of life.

The HB 1217 fiscal note put MDE's cost at least $1.0 million in fiscal 2027 for a permit-tracking database. The bill had a hearing on March 11, 2026 in the House Environment and Transportation Committee. The General Assembly bill page, last updated June 30, 2026, shows no committee report or floor action. Plan to the regulation as written and re-check the 2027 session.

Where hot water sits in a Maryland multifamily building

The EIA's 2020 Residential Energy Consumption Survey reports that apartments in buildings with five or more units used 10.1 million Btu per household per year for water heating: 29.9 percent of 33.7 million Btu of total site energy.

The 29.9 percent national share is a placeholder until the building's own summer gas bills replace it. The water heating load itself does not change with the climate. In a central-plant building, it is the one end use the owner controls without entering apartments.

  • Building assumptions: 100,000 square feet of multifamily housing, site EUI of 70 kBtu per square foot, gas-fired space heating and central domestic hot water.
  • Gas share of site energy: 70 percent assumed, so 49 kBtu per square foot of gas.
  • Net direct emissions: 49 kBtu per square foot × 53.11 kg per MBtu / 1,000 = 2.60 kg CO2e per square foot.
  • 2030-2034 standard: 0.82 kg CO2e per square foot. The excess is 1.78 kg CO2e per square foot, or 178 metric tons per year for the building.
  • Alternative compliance payment: 178 metric tons × $230 per metric ton = about $41,000 per year before inflation adjustment and the $4 annual escalator.
  • Water heating gas: 70 × 0.299 = 20.9 kBtu per square foot, or 2.09 billion Btu per year.
  • Water heating direct emissions: 20.9 × 53.11 / 1,000 = 1.11 kg CO2e per square foot, or 111 metric tons per year.
  • Water heating payment: 111 metric tons × $230 = about $25,500 per year in 2020 dollars.
  • Heat delivered: At an assumed 80 percent boiler efficiency, 20.9 × 0.80 = 16.7 kBtu per square foot, or 1.67 billion Btu and 490,000 kWh thermal per year.

Electrification with a central heat pump water heater

The assumed annual COP is 2.5, within the 1.9 to 3.2 range measured at five California multifamily sites in the central heat pump water heater field study.

  • Electrical input: 490,000 kWh thermal / 2.5 = 196,000 kWh electrical per year.
  • Net direct emissions from water heating: Zero, because grid electricity is treated as an emissions-free input.
  • Building emissions after the measure: 2.60 − 1.11 = 1.49 kg CO2e per square foot. The building remains above 0.82 kg CO2e per square foot, so space heating must follow.
  • Remaining excess: 0.67 kg CO2e per square foot, or 67 metric tons per year, equal to about $15,400 per year at the 2030 rate.

What the arithmetic requires

To meet 0.82 kg CO2e per square foot with gas alone, the building could burn no more than 15.4 kBtu per square foot. To meet 0.41 kg CO2e per square foot in 2035, it could burn no more than 7.7 kBtu per square foot. In 2040, allowable direct emissions are zero.

The arithmetic produces the same sequence for multifamily, lodging and senior living buildings: the hot water plant is the direct-emissions source that can be removed first because the work occurs entirely in the mechanical room. The space heating plant follows on the 2035 and 2040 steps.

Why storage decides whether the heat pump fits

The emissions arithmetic does not involve the tank. The project does. Storage changes the heat pump capacity, electrical service requirement, demand profile and mechanical-room layout.

  • Electrical service: A heat pump plant sized to the gas water heater's recovery rate draws its full kW at the morning peak. A plant sized to the daily average with storage draws roughly half, which is often the difference between the existing service and a utility upgrade. The NEC 220.87 article shows the measured-demand method.
  • Demand charges: Maryland's commercial tariffs bill demand. A plant that charges storage overnight keeps the heat pump out of the billed peak. The demand charge reduction article gives the method.
  • Winter inlet and winter air: Maryland winter inlet water and outdoor air lower an air-source heat pump's capacity when the load is highest. The cold-climate air-to-water article shows storage growing as temperature drops, and the 140 F storage article covers the setpoint that Legionella control imposes.
  • Mechanical room: The TEHQ Thermal Tank assembles from panels inside the room. The 700-gallon module is 60 inches in diameter and 88.6 inches tall, weighs 6,046 lb filled, loads the floor at 308 lb per square foot, stores 108 kWh thermal at a 35 C (63 F) delta and loses 2.4 F per 24 hours under free convection according to the specification sheet.
  • Worked storage scale: The example building's 490,000 kWh thermal per year is about 1,340 kWh thermal per day. A morning peak of one-third of the day is roughly 450 kWh thermal, or four to five modules at the rated delta before the usable delta is applied. The sizing calculator sets the count from the building's own draw profile.

A Maryland compliance sequence for a hot water measure

  • Confirm coverage and property type in Portfolio Manager. Confirm the June 1 benchmarking submission and the 2026 verification. Check whether the building sits in Montgomery County's program instead of the state's.
  • Pull the net direct emissions figure from Portfolio Manager and compare it to the 2030-2034 and 2035-2039 standards for the property type. Convert the excess to tons and to dollars at $230 per ton plus escalation.
  • Separate water heating gas from space heating gas with summer bills. Replace the 29.9 percent placeholder with the building's own share.
  • Price a heat pump plant sized to the daily load with storage. Use the manufacturer's COP at Maryland winter conditions and follow the sequence in the hub article on electrifying hot water in existing buildings. Run the electrical check before fixing the design.
  • Stack the money: utility incentives, C-PACE financing and the 48E credit where the storage serves space heating rather than domestic hot water. Each topic has its own article: utility incentives, C-PACE financing and the 48E credit.
  • Re-verify the Table 1 values, the site EUI standard MDE planned for 2027 and the outcome of any 2027 legislation before quoting a target to an owner. Colorado, Washington and New York City standards are covered in separate articles: Colorado, Washington and New York City.

Frequently Asked Questions

Which buildings are covered by Maryland BEPS?

Commercial and multifamily buildings of 35,000 square feet or larger, excluding parking garage area, under COMAR 26.28. HB 49 (2025) removed hospitals from coverage. Schools, historic, agricultural, manufacturing and federally owned buildings may apply for exemption. Buildings in Montgomery County's certified program report to the county instead.

When is Maryland BEPS benchmarking due?

Benchmarking is due June 1 each year in ENERGY STAR Portfolio Manager, beginning with the 2025 report. Third-party verification is required in 2026 and every five years after.

What is the Maryland BEPS standard for multifamily buildings?

Net direct emissions must not exceed 0.82 kg CO2e per square foot in each year from 2030 through 2034, 0.41 kg CO2e per square foot from 2035 through 2039 and zero from 2040 under COMAR 26.28.03.02. Hotels are 1.47 and then 0.74; senior living communities are 1.43 and then 0.72.

What is the alternative compliance payment?

The payment is $230 per metric ton CO2e in 2020 dollars, adjusted for inflation, rising by $4 in 2020 dollars each year from 2030. It applies to emissions above the standard. Affordable housing owners may apply annually for a reduced rate.

Does electricity count toward net direct emissions?

No. TM 24-01 treats electricity as an emissions-free input for the direct-emissions calculation. A heat pump water heater operating on grid power therefore removes the water-heating line from the building's direct emissions calculation. This article does not apply a Maryland grid emissions factor.

How much of a multifamily building's direct emissions come from hot water?

Using the EIA share of 29.9 percent of site energy and the labeled assumptions in the worked example, about 1.1 of 2.6 kg CO2e per square foot comes from water heating in a gas-heated building, or roughly 40 percent. The building's summer gas bills should replace that estimate.

Is there a site EUI standard yet?

Not as of October 2026. MDE's program background says it will set site EUI standards after analyzing benchmarking data and plans to adopt them in 2027. HB 49 requires a cost-benefit analysis by December 31, 2026.

Did HB 1217 exempt older buildings?

As of the General Assembly's bill page on June 30, 2026, HB 1217 had a committee hearing on March 11, 2026 and no further recorded action. Plan to the regulation as written.

The bottom line

Maryland's standard counts what burns on site. From 2030, a multifamily building is held to 0.82 kg CO2e per square foot in every year, half that from 2035 and zero from 2040. Emissions above the line carry a $230-per-ton payment in 2020 dollars, with inflation adjustment and the annual $4 escalator.

In a gas-heated building, water heating is roughly 40 percent of direct emissions on the EIA share. It is also the share an owner can remove without entering an apartment. The heat pump removes the direct emissions; storage keeps the plant small enough to fit the electrical service, operate off-peak and carry a Maryland winter morning.

Benchmark by June 1, verify in 2026, price the hot water plant first and re-verify the standards against the current rule before putting any number into a capital plan.

Explore the right thermal

energy solution for your project.

Tell our team about your building, operating goals, and energy needs.

Get in touch

Let's review your project

Send us a message and our team of experts will get right back to you — or grab a time on our calendar below.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Address
900 South Glaspie Street, Oxford, MI 48371 USA

Prefer to book a time? Grab a slot below